[schooltool-dev] Proposed Release Schedule
Jason Straw
lists at misato.us
Fri May 4 10:51:58 EDT 2007
That is my current hope. schooltool-cando would be perfect.
I did talk to David Welsh, he agrees with timeline.
I believe ignas has moved trunk to 3.4 eggs.
Jason
Brian Sutherland wrote:
> On Fri, May 04, 2007 at 09:09:03AM -0400, Jason Straw wrote:
>
>> This is very very good for CanDo 2007 as well.
>>
>> CanDo will probably begin to freeze July 1 as well for a 2007.0 release
>> August 1-16
>>
>> I'll talk to David Welsh and Jeff Elkner and try and match our timeline
>> of feature freeze to about SchoolTool's.
>>
>
> If you do this, then I suggest we build a schooltool-cando package that
> depends on and extends the schooltool package.
>
> Also, it looks fairly certain that Gutsy will have Zope 3.4., so I
> suggest we target that zope release.
>
> (looks like we might already be)
>
>
>> Jason Straw
>>
>> Brian Sutherland wrote:
>>
>>> Hi,
>>>
>>> I'm busy at the BOF of edubuntu, we're trying to see how the release
>>> schedule of SchoolTool can fit into gutsy edubuntu and have come up with
>>> the following hard deadlines:
>>>
>>> August 16: Deadline for the last major SchoolTool Release
>>>
>>> October 4: Translation deadline
>>>
>>> Given that trying to sneak by just before the end of the deadline is
>>> probably not a good idea, I propose that we:
>>>
>>> * Produce alpha quality releases ASAP
>>> * Beta release (feature freeze), July 1
>>> * Final release for, August 1
>>>
>>> Now, these things should be possible from a packaging point of view, but
>>> are they possible from a code point of view? Because basically if we
>>> miss the August 16 deadline, it will become much more difficult to have
>>> our release included in Gutsy.
>>>
>>>
>>>
>> _______________________________________________
>> Schooltool-dev mailing list
>> Schooltool-dev at schooltool.org
>> http://lists.schooltool.org/mailman/listinfo/schooltool-dev
>>
>>
>
>
More information about the Schooltool-dev
mailing list